US 54- Surface improvements at various locations; diamond grinding operations scheduled in eastbound lanes June 23-July 8 and westbound July 6-10; Estimated Completion: Fall 2014.

US 54 – Inactive; Steel grid deck and joint repair on Champ Clark Bridge; Contractor to begin repairs in (8) locations within the project limits, Contractor to begin repairs in eight (8) locations with the project limits, tentaively scheduled to begin mid to late July, closure of bridge lasting for 4-5 days; Estimated Completion: Fall 2014.

US 61 – Inactive; Pavement undersealing on southbound lanes from Pike County Road 310 near Bowling Green to Route E near Eolia, 18.816 miles.

 

Maintenance

Route V – June 30 road closed from 7 a.m. to 4 p.m. from Route W at Vandalia to Route M for sealing operations; please use alternate routes.

Route M – July 1 road closed on north end from 7 a.m. to 4 p.m. from Route Y to US 54 at Curryville for sealing operations; please use alternate routes.

Route Y – July 2 & 7 road closed from 7 a.m. to 4 p.m. from the beginning of State Maintenance at Pike County Road 491 at Estes to Business 61 in Bowling Green for sealing operations; please use alternate routes.

Various Routes – Possible intermittent lane closures or slow moving vehicles blocking driving lane for surface and/or roadside maintenance operations in various locations.